What We Require On-Site
To achieve a premium architectural finish, we require the following prior to our arrival:
Waste Disposal: ProSand bags all concrete waste. For small-scale projects, we will remove the waste from the site. For high-volume full-stone exposure projects, an on-site skip bin or designated disposal area must be provided by the client due to the sheer weight of the slurry and dust.
- Clear Access: Unhindered parking and clean, direct access to the concrete slab at all times.
- Utilities: Active water and specific electrical outlets are required on-site throughout the grinding process. We require 1 x 3-Phase power outlet (for our main planetary grinder) and 2 x separate Single Phase power outlets on dedicated circuits (for our dust extractors and edge machinery). If power is unavailable on-site, a generator hire fee will apply.